Gunning Sewer Main – NSW
It involved supply and installation of approx 200m of sewer main installation using DN150 oPVC pipe. It includes 4 x underboring as a sleeving and installation of 4 x sewer manholes (1050) and connecting to the lagoon. Property connection of DN65 PE
CONTRACT TYPE: AS 4000
WORK TYPE: D&C
LOCATION: Biala Road, Gunning
CLIENT: Upper Lachlan Council
VIC-Wangaratta – Water Main Replacement
Water Main Replacement in Wangaratta. It was involved in DN300 and DN100 mPVC pipeline. Construction was involved in the main city area and on the road including the major commercial area. It was also involved in crossing VIC road where complex connection over 3m deep. This was also included DN550 MSCL pipeline connecting to DN300. Major excavation was involved including complex valve configuration. Major property connection was included to school, courthouse, police station, EPA and water treatment plant where constant supply required. Project Value was approx. $750k. Efficient stakeholder management, good communication, well and advance planning, Developing Commissioning plan, well managed material stocks make the delivery of the project very efficient.
CONTRACT TYPE: AS 4000
WORK TYPE: D&C
LOCATION: D&C
CLIENT: North East Water
Cooma and Jindabyne Water Main – NSW
It involved supply and installation of DN150, DN200 and DN300 for several streets of water main replacements includes valve and hydrant installations and decommissioning old main. Construction was involved in busy road as well as property connections to the residents. The project was performed in combination of Under bore and trench. Efficient stakeholder management, good communication, well and advance planning makes the delivery of the project simpler.
CONTRACT TYPE: Principal Contractor (MW21)
WORK TYPE: D&C
LOCATION: Jindabyne
CLIENT: Snowy Monaro Council
DURATION: 2020
Singleton Water Main Renewal Program – NSW
Singleton Council operates and maintains water and wastewater systems that include a water treatment plant, water reservoirs, water pumping stations and water reticulation network.
Utilstra has been awarded as a Principal Contractor for the Design and Construction of approx. ~18km water mains involved of 40 different streets of various sizes. It is a 2 years contract + option 1 year.
Utilstra have multiple crews working at the same time and working in multiple locations.
CONTRACT TYPE: Principal Contractor (GC21)
WORK TYPE: D&C
LOCATION: Whole Singleton Council Area
CLIENT: Singleton Council
DURATION: 2019 - 2021