CONTRACT TYPE: AS4000
WORK TYPE: Construction
LOCATION: Harvey Bay, Fraser Coast
CLIENT: Fraser Coast Regional Council
DURATION: 15 Months
ABOUT PROJECT:
Construction of a new booster pump station building housing the following:
Construction of a new booster pump station building housing the following:
- Pump room containing reservoir bypass pipework for gravity flow, boosted pump flow and a spare space for a future pump
- Switch room for the housing of the new site wide switchboards and pump drives
- Chemical storage room housing the new site wide sodium hypochlorite storage, analysing and dosing facility
- Chemical delivery truck bunded area
- Booster pump installation (principal free issue)
- New pump station pipework including critical cut-ins
- New below ground conduit system for new site wide electrical/control systems
- New site wide storm water collection and discharge system
- New site wide dosing and sampling pipework outside of chemical storage room
- New access road and associated landscaping
SOW:
Construction of a new booster pump station building housing the following:
Construction of a new booster pump station building housing the following:
- Pump room containing reservoir bypass pipework for gravity flow, boosted pump flow and a spare space for a future pump
- Switch room for the housing of the new site wide switchboards and pump drives
- Chemical storage room housing the new site wide sodium hypochlorite storage, analysing and dosing facility
- Chemical delivery truck bunded area
- Booster pump installation (principal free issue)
- New pump station pipework including critical cut-ins
- New below ground conduit system for new site wide electrical/control systems
- New site wide storm water collection and discharge system
- New site wide dosing and sampling pipework outside of chemical storage room
- New access road and associated landscaping
CHALLENGE:
- Existing Ground Condition
- Stakeholder Management
INNOVATION:
Proactive Planning – weekly basis
Proactive Planning – weekly basis