Bloomsbury Water Main, Mackay QLD

CONTRACT TYPE: AS 2124-1992

WORK TYPE: Design and Construction

LOCATION: Bloomsbury, Mackay QLD

CLIENT: Mackay Regional Council

DURATION: 15 months

ABOUT PROJECT:
This project is to maintain supply of water to Bloomsbury residents by adding a new pipeline, new storage tank and a new booster pump. The new pipeline provides opportunity for residents along the pipeline to connect to the main and be provided with safe treated water from a plentiful supply. It includes:
  • 15.3km of Watermains:
  • Size varies from 40mm to 150mm,
  • Material to be PE, PVC and DICL
  • Booster pump station
  • Pumpstation Building Incl Switchroom
  • Reservoir Tank
  • Access Track
SOW:
  • 15.3km of Watermains:
  • Size varies from 40mm to 150mm,
  • Material to be PE, PVC and DICL
  • Booster pump station
  • Pumpstation Building Incl Switchroom
  • Reservoir Tank
  • Access Track